The new Surrey Hospital and BC Cancer Centre Design-Build team, alongside Fraser Health have begun construction on this new, fully electric, smart healthcare facility. The team has invested significant time into future proofing the facility to accommodate for a full spectrum of advanced technologies including a mobile app to integrate wayfinding, RTLS, automation of the AGV’s and future adaptability to emerging technologies to enhance hospital operations and patient outcomes. Healthcare FM teams are charged with continuously optimizing patient experience, whole-life asset condition, energy performance against cost and resource constraints. Technology, and a data/condition-based approach to asset management, is changing the way we enable clinical excellence.
Learn about:
What is required from the integrated design and construction team to deliver an advance, high-tech healthcare facility, while also planning for future integration?
Simulation Lab: Understanding the importance leveraging a Simulation Lab in supporting constructability of technology requirements and reducing deployment risk.
Aligning patient and user journey’s through the design process.
Incorporating advances planning to meet growing community needs and share the patient journey keeping care providers informed in every step.
- Date:May 15, 2025
- Time:1:10 pm
- Event:Private: Responding to the Changing Playbook: Risk Management, Adaptability and Resiliency